
Design the system.
Optimise the business case.
Evana is the techno-economic optimiser for pre-engineering. Bring installation design, sizing, operation and contracts together before you invest. Flow uses the same optimisation engine for daily operation.
01Technology and sizing
02Energy contracts and grid limits
03Investment and operation
A good choice for one asset
does not guarantee a good system.
An electric boiler changes your electricity demand. Storage changes your consumption profile. An energy contract changes the value of flexibility. Evana helps you assess these effects together.
From process demand to energy supply.
Connect production profiles, steam demand, heating, cooling and electricity with the assets that must deliver them.
From expansion to a new site.
Investigate electrification, replacement, additional storage or an entirely new configuration — including phased development.
From configuration to business case.
Compare sizing, annual operation, energy contracts and operating performance using one consistent set of assumptions.
Compare CAPEX, OPEX, lifecycle costs and sensitivities on the same basis. Give management, commercial teams and financiers insight into the choices that shape the business case.
Multiple energy vectors.
One coherent model.
Energy vectors interact constantly on an industrial site. Evana brings together generation, conversion, storage and consumption, revealing the relationships between technologies.
What changes when you convert, store or procure energy differently?
Compare electrification with gas-fired production, for example, or investigate how thermal storage affects electrical load. The available component models and process requirements determine the scope of each study.
The energy system.
In one workspace.
Connect the system’s components in the Topology Editor. The model links physical energy flows with technical parameters, profiles and financial assumptions.
Click the image to enlarge ↗
Which combination fits your site and your contract?
We start with your profiles, process requirements, grid limits and investment questions.
Optimise the installation.
And the contract around it.
A sound technical solution also needs to work economically. That is why we examine energy contracts alongside the operation and sizing of your assets.
Contract options are compared against the same demand, technology and supply requirements. This makes the reasons for differences in the results clear.
Price structure
& procurement
What do fixed or time-dependent energy prices mean for the selected technology and the value of storage?
Grid capacity
& volumes
How do consumption, export, capacity agreements and volume commitments fit the operating profile?
PPAs, flexibility
& contract choices
Optimise a PPA’s volume and generation profile together with consumption, conversion, storage and additional procurement. Identify profile mismatches and how asset operation can respond.
Risk
& resilience
How sensitive is the business case to changing prices, production volumes or the next step in electrification?
Assess PPA options against total costs, consumption and export, grid limits and exposure to price changes. Contract conditions and optimisation variables are explicitly included in the study scope.
Design with insight.
Invest with confidence.
Evana makes alternatives easier to discuss. Technical and economic choices are explored using the same assumptions and explicit constraints.
Which installation fits your site?
Compare the combination and sizing of generation, conversion, storage and consumption. Include production profiles, supply requirements and grid limits from the outset.
- Power and storage capacity
- Electricity, heating, cooling, steam, natural gas and hydrogen
- Investment, annual operation and technical limits
Insight sharpens design.
Control takes it further.
Pulse, Evana and Flow connect actual performance, design choices and daily optimisation through SYNAPSE. Each step provides insights for the next.
Select a product in the flywheel to learn more. The current product page is highlighted.